Experts in Hydro Power Project Development

t: 01539 720028

Dowally

The Dowally scheme is located on the edge of the A9 to the south of Pitlochry, on the Atholl Estate. The Estate constructed this scheme in tandem with a second project at Broom which is installed approximately 5 miles north on the A9.

This turbine produces 496kW at peak power. The scheme is grid connected and all power produced is exported. The average annual energy production ("AAEP”) is 2,000MWh and the scheme benefits from the UK Feed In Tariff ("FiTs”) subsidy mechanism.

Click here to download the Dowally case study PDF.

Back to all projects